top of page
Work Plan
Project Planning
Basic skeletal planning of the project was done.
4/11-5/12
Data Verification
The collected data was verified during this period.
12/02-15/02
Work Distribution
Work was distributed among the students.
6/12-13/01
Designing
The website was using the collected data in this time period.
16/02-20/03
Collecting Data
The data was collected during this time.
14/01-12/02
Final Checks
The final checks on all the features and data was done.
20/03-23/03
bottom of page